8.1  INSTALLED CAPACITY OF ELECTRICITY IN GUJARAT STATE 8.1  INSTALLED CAPACITY OF ELECTRICITY IN GUJARAT STATE
                   (In MW)       (In MW)  
Sr. As on Gujarat Electricity Board     Central Total Sr.
No. 31st March Hydro Steam Gas Diesel Total GSECL AEC GIPCL ESSAR GTEC GSEG Bhav. Total Sector Installed No.
of the Year and Ele Share Capacity
Wind Co. (7+15+16)
1 2   3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1
1 1961 - 110.50 - 32.50 143.00 - 157.50 - - - - 12.00 169.50 - 312.50 1
2 1966 - 374.50 - 10.50 385.00 - 217.50 - - - - 16.00 233.50 - 618.50 2
3 1969 - 384.50 - 32.70 417.20 - 217.50 - - - - 16.00 233.50 - 650.70 3
4 1974 - 649.50 54.00 9.10 712.60 - 217.50 - - - - 16.00 233.50 - 946.10 4
5 1978 300.00 1120.50 54.00 - 1474.50 - 217.50 - - - - 16.00 233.50 - 1708.00 5
6 1985 300.00 2352.50 54.00 - 2706.50 - 400.00 - - - - - 400.00 277.00 3383.50 6
7 1990 365.00 3329.00 54.00 - 3748.00 - 495.50 - - - - - 495.50 580.00 4823.50 7
8 1991 425.00 3399.00 54.00 - 3878.00 - 482.00 32.00 - - - - 514.00 702.00 5094.00 8
9 1992 425.00 3609.00 54.00 - 4088.00 - 550.00 145.00 - - - - 695.00 810.00 5593.00 9
10 1993 425.00 3729.00 114.00 - 4268.00 - 550.00 145.00 - - - - 695.00 994.50 5957.50 10
11 1994 427.00 3729.00 189.00 - 4345.00 - 550.00 145.00 - - - - 695.00 1100.50 6140.50 11
12 1995 427.00 3729.00 189.00 - 4345.00 - 550.00 145.00 - - - - 695.00 1201.00 6241.00 12
13 1996 427.00 3729.00 189.00 - 4345.00 - 550.00 145.00 - - - - 695.00 1323.00 6363.00 13
14 1997 427.00 3804.00 189.00 - 4420.00 - 550.00 145.00 192.00 - - - 887.00 1323.00 6630.00 14
15 1998 487.00 3759.00 234.00 - 4480.00 210.00 550.00 305.00 300.00 414.00 - - 1779.00 1323.00 7582.00 15
16 1999 547.00 3759.00 234.00 - 4540.00 420.00 550.00 305.00 300.00 655.00 - - 2230.00 1323.00 8093.00 16
17 2000 547.00 3759.00 234.00 - 4540.00 420.00 550.00 555.00 300.00 655.00 - - 2480.00 1323.00 8343.00 17
18 2001 547.00 3759.00 234.00  - 4540.00 420.00 550.00 555.00 300.00 655.00 -  - 2480.00 1562.00 8582.00 18
19 2002 547.00 3759.00 207.00  - 4513.00 420.00 490.00 555.00 300.00 655.00 156.00 - 2576.00 1562.00 8651.00 19
20 2003*   547.00 3759.00 27.00  - 4333.00 555.00 490.00 555.00 300.00 655.00 156.00 - 2711.00 1562.00 8606.00 20
*  April-November, 2002 Source:- Gujarat Electricity Board, Vadodara.
Note : (1) Utran TPS Stage-1 three units of 15 MW capacity each have been retired w.e.f. 19-9-02
          (2) Utran Gas Based Power Station of 135 MW has been taken over by M/s. GSECL, w.e.f. 1-8-02